1. Remove a wire of weight from the accumulator. Unscrew screws and remove a plastic casing from the top part of a head of the block of cylinders. |
2. On engines of a turbo of low pressure remove the metal and elastic pipe connecting a final collector with турбонагнетателем, and on engines of a turbo of a high pressure remove a pipe connecting a collector with the heat exchanger. |
|
3. Unscrew screws (are specified by arrows) fastenings of an arm of a plait of wires to the top part of an inlet collector. |
|
4. Disconnect electric sockets from gauges of a cooling liquid, the fuel pump of a high pressure, the gauge of a cranked shaft and the gauge of excess of pressure of a collector and move an arm of a plait of wires aside from a collector. |
|
5. Remove a vacuum pipe from the valve of system of repeated burning of the fulfilled gases located on the top part of a collector. |
|
6. Unscrew a connecting nut of fastening of a pipe of giving of fuel to an atomizer. |
|
7. Unscrew a connecting nut of fastening of a pipe of giving of fuel to the fuel pump. |
|
8. Remove pipelines of giving of fuel from the fuel pump to fuel atomizers. |
|
9. In regular intervals and gradually unscrew bolts and remove the top part of a collector. |
|
10. To remove the bottom section of an inlet collector, disconnect a vacuum pipe from the diaphragm valve. |
|
11. Unscrew a bolt of fastening of an arm of an electric socket. |
|
12. In regular intervals and gradually unscrew nuts of fastening and remove the bottom section of a collector with a lining from a head of the block of cylinders. |
|
13. Establish the bottom section of an inlet collector together with a lining on a head of the block of cylinders and fix nuts, tightening them in diagonal sequence. |
14. Connect a vacuum hose of the valve of a diaphragm and establish an arm with an electric socket. |
15. Establish the top section of an inlet collector together with a lining and fix bolts. |
16. Establish an arm of a plait of wires on the top part of a collector and fix bolts. Connect electric sockets and connect a vacuum pipe to the valve of repeated burning of the fulfilled gases. |
17. Establish the inlet air channel and establish a plastic casing on a head of the block of cylinders. |
18. Connect the accumulator, start the engine and check up tightness of fuel system. |