Opel Vectra B

Since 1995 of release

Repair and car operation



Opel of Vektra
+ 1.1. Controls and control devices
+ 2. Maintenance service
+ 3. Engines
+ 4. Heating, ventilation
+ 5. Fuel system
+ 6. Systems of start, ignition
- 7. Transmission
   + 7.1. Coupling
   + 7.2. A mechanical transmission
   - 7.3. An automatic transmission
      7.3.1. Introduction
      7.3.2. Technical characteristics
      7.3.3. Oil replacement in a transmission
      7.3.4. Adjustment of the lever of the selector
      7.3.5. A selector cable
      7.3.6. The selector lever
      7.3.7. Replacement of a sealing ring of the hydrotransformer
      7.3.8. Electric elements of management of a transmission
      7.3.9. The switch of a manner of movement
      7.3.10. The electronic control device
      7.3.11. Gauges of an entrance and conducted shaft of a transmission
      7.3.12. The gauge of temperature of oil of a transmission
      7.3.13. Removal and transmission installation
      7.3.14. Transmission major repairs
   + 7.4. Power shafts
+ 8. Brake system
+ 9. A running gear
+ 10. A body
+ 11. An electric equipment
+ 12. The basic malfunctions



7.3.13. Removal and transmission installation
THE GENERAL DATA

Fastening of hoses of an oil radiator to a transmission on engines of 1,6 l

1. A hose
2. Скоба fastenings
3. The transmission union

Arrangement of hoses of an oil radiator on a transmission on engines of 1,8 and 2,0 l

1. A hose
2. Скоба fastenings
3. The transmission union
4. Bolts

Removal

PERFORMANCE ORDER
1. Lift a forward part of the car and fix on supports. Establish the selector lever in position N. Remove forward wheels and an engine mudguard.
2. Merge oil from a transmission.
3. Remove the accumulator, a support of the accumulator and a starter.
4. On engines of 1,6 l remove the ignition block.
5. Remove a cable of the selector from the lever of a choice of transfers on a transmission. Remove a cover of a cable of the selector from an arm on a transmission.
6. Disconnect electric sockets of gauges and transmission switches. Release wires from скоб fastenings on a transmission.
7. Disconnect a hose of ventilation from the top part of a transmission.
8. Remove hoses of an oil radiator from a forward part of a transmission (Fastening of hoses of an oil radiator to a transmission fig. see engines of 1,6 l, fig. the Arrangement of hoses of an oil radiator on a transmission on engines 1,8 and 2,0).
9. Close hoses stoppers.
10. Remove the bottom frame of a forward suspension bracket. Thus reliably support the engine.
11. Take from a transmission internal hinges of power shafts and tie up their wire to a body.
12. Unscrew bolts and separate the left support of the power unit from a forward part картера transmissions.
13. Remove a rubber cover from a ledge of the oil pallet for access to bolts of fastening of the hydrotransformer. Unscrew a visible bolt of fastening of the hydrotransformer, then turn a cranked shaft of the engine and unscrew other bolts. On engines of 1,6 l it is used three bolts, and on engines of 1,8 and 2,0 l it is used six bolts of fastening of the hydrotransformer.
14. Move the hydrotransformer on an entrance shaft to картеру transmissions.
15. Establish a jack under a transmission and raise it so that the transmission weight was perceived by a jack.
16. Unscrew bolts of fastening of a transmission to the engine.
17. Move a jack and a transmission to the right and remove a transmission from directing pins. Lower a jack together with a transmission and take a transmission from under the car.

Installation

PERFORMANCE ORDER
Transmission installation is made in sequence, return to removal taking into account following moments:

 – Check up that directing pins are established on the places;
 – Replace sealing rings of power shafts;
 – At installation of pipes of an oil radiator establish new sealing rings;
 – Fill in oil in a transmission.