Opel of Vektra
+ 1.1. Controls and control devices
+ 2. Maintenance service
+ 3. Engines
- 4. Heating, ventilation
- 4.1. Cooling system
4.1.1. Introduction
4.1.2. Technical characteristics
4.1.3. Hoses of system of cooling
4.1.4. A radiator
4.1.5. The thermostat
4.1.6. The radiator fan
4.1.7. The additional fan of a radiator on diesel engines of 1,7 l
4.1.8. The additional electropump of cooling on diesel engines of 1,7 l
+ 4.1.9. Electric gauges
4.1.10. The water pump
+ 4.2. A heating system and ventilation
4.3. Air central air
+ 5. Fuel system
+ 6. Systems of start, ignition
+ 7. Transmission
+ 8. Brake system
+ 9. A running gear
+ 10. A body
+ 11. An electric equipment
+ 12. The basic malfunctions
|
ENGINES SOCH OF 1,6 L
The prevention
At thermostat installation it is necessary to establish a new sealing ring.
Removal
PERFORMANCE ORDER
|
1. Remove a wire of weight from the accumulator. |
2. Merge cooling liquid from cooling system. |
3. Loosen the a collar also disconnect the top hose from a thermostat casing on the right party of the engine. |
4. Remove a gear belt, an intermediate pulley, a pulley of a camshaft and a back casing of a gear belt. |
5. Unscrew bolts and uncover the thermostat a head of the block of cylinders. |
6. Take the thermostat from a casing and remove a sealing ring. |
|
Check
|
Rough check of the thermostat can be spent, having suspended it on a thread in the glass vessel filled with water and heating up water to boiling. At boiling of water the thermostat should open. Otherwise replace it. |
The temperature of opening of the thermostat is put on the thermostat.
The thermostat which is not closed at water cooling, also is subject to replacement.
Installation
PERFORMANCE ORDER
|
1. Clear interfaced surfaces of a cover of the thermostat and a head of the block of cylinders. |
2. Establish the thermostat in a head of the block of cylinders together with a new sealing ring. |
3. Establish a cover of the thermostat and fix bolts. |
4. Establish a back casing of a gear belt, a camshaft pulley, a gear belt and an intermediate pulley. |
5. Connect the top hose to the thermostat and fix a collar. |
6. Fill in cooling liquid in cooling system. |
7. Connect the accumulator. |
|
PETROL ENGINES DOCH 1.6, 1.8 AND 2,0 L
Removal
PERFORMANCE ORDER
|
1. Remove a wire of weight from the accumulator. |
2. Merge cooling liquid from cooling system. |
3. Loosen the a collar also remove the top hose from a thermostat cover. On engines of 1,6 l the thermostat cover is established to the case attached by bolts by the forward end of the engine. On engines of 1,8 and 2,0 l a cover the thermostat fastens bolts directly to a head of the block of cylinders. Thus it is necessary to remove in addition small hose. |
|
4. Unscrew bolts and uncover the thermostat in which the thermostat (on a photo – the thermostat of petrol engine DOCH 1,6) is fixed. |
|
5. On engines of 1,6 l remove a sealing ring. |
6. Whether on engines of 1,8 2,0 l remove a lining. |
|
Check
Engines SOCH of 1,6 l see
Installation
PERFORMANCE ORDER
|
1. Clear interfaced surfaces of a cover and a thermostat casing. |
2. Establish a thermostat cover together with the thermostat and a sealing ring or a lining and fix bolts. |
3. Connect the top hose to the thermostat and fix a collar. |
4. Fill in cooling liquid in cooling system. |
5. Connect the accumulator. |
|
THE DIESEL ENGINE OF 1.7 L
Removal
PERFORMANCE ORDER
|
1. Remove a wire of weight from the accumulator. |
2. Merge cooling liquid from cooling system. |
3. Remove the accumulator and an accumulator support. |
|
4. Loosen the a collar of fastening of a hose. |
|
5. Disconnect the top hose from a cover of the thermostat located on a left-hand side of a head of the block of cylinders. |
|
6. Unscrew bolts of fastening of a cover of the thermostat. |
|
7. Uncover the thermostat together with the thermostat. Remove a lining. |
|
Check
Engines SOCH of 1,6 l see
Installation
PERFORMANCE ORDER
|
1. Clear interfaced surfaces of a cover and a thermostat casing. |
2. Establish the thermostat in a casing ventilating apertures upwards. |
3. Establish a cover together with a new lining and fix bolts. |
4. Establish the top hose and fix a collar. |
5. Establish a support of the accumulator and the accumulator. |
6. Fill in cooling liquid in cooling system. |
7. Connect the accumulator. |
|
THE DIESEL ENGINE OF 2 L
Removal
PERFORMANCE ORDER
|
1. Remove a wire of weight from the accumulator. |
2. Merge cooling liquid from cooling system. |
3. Lift a forward part of the car and fix on supports. |
4. Remove a mudguard from under the engine. |
5. To remove the standard thermostat located in the forward party of a head of the block of cylinders, at first disconnect electric sockets from the temperature gauge, then remove three hoses, unscrew bolts and remove a casing in which the thermostat is established. |
|
Check
Engines SOCH of 1,6 l see
Installation
PERFORMANCE ORDER
|
1. Clear interfaced surfaces of a cover of the thermostat and a head of the block of cylinders. |
2. Establish a cover of the thermostat with a new lining and fix bolts. |
3. Repeatedly connect hoses and electric sockets. |
4. Establish a mudguard and lower the car. |
5. Fill in cooling liquid in cooling system. |
6. Connect the accumulator. |
|
|
|